The North American Council for Freight Efficiency (NACFE) has issued a Guidance Report detailing the current and likely short-term future of a comprehensive charging network for electric trucks. This is the the 30th report issued by the group, and its third Guidance Report that looks specifically at emerging technologies in the trucking industry.

NACFE is a non-profit organization that seeks to help North American trucking fleets deploy new technologies that help reduce the use of fossil fuels while boosting productivity and profitability.

Mike Roeth, NACFE’s executive director, noted that the future is coming fast in regard to electric trucks. However, he noted, that since it appears that the initial deployment of these vehicles will be in medium-duty applications, its latest Guidance Report will focus on charging and infrastructure considerations for those vehicles. NACFE will turn its attention to infrastructure and charging requirements for heavy duty/long-haul battery electric trucks at a later date.

The report was created with the help of the Rocky Mountain Institute, another non—profit group that is dedicated to creating a sustainable, global, green energy infrastructure. Jessie Lund, an associate specializing in freight and transportation issues with the group, said that NACFE has determined that when thinking about a future charging infrastructure for electric trucks, fleets must plan for three separate but related components: hardware, software/networking and maintenance.

The hardware component consists of electric vehicle supply equipment (EVSE), also known as charging stations, which charge the batteries of electric vehicles. The most common type of EVSE is a plug-in charging station. At this point, charging station connectors are not standardized and there are a number of competing connector types.

EVSE offer two charging speeds that work for commercial vehicles: Level 2, which requires installation of charging equipment and a dedicated circuit of 20 to 100 amps, and DC fast charging, which requires installation of charging equipment and a dedicated circuit.

Wireless and conductive charging systems are also available, though much less popular except in some niche markets.

Roeth noted that the most common – and yet crucial -- piece of technology for electric truck fleets is charging software. “This technology is really a key enabler that allows fleets to easily and cost-effectively managing fleet charging operations,” Roeth stressed. “And it is also the main differentiator between EVSE provider companies. For example, software is what allows multiple chargers on-site to be able to communicate with one another to optimize sequencing, load management, and variable time-of-day electricity rates and other factors that ensure that a fleet is charging smartly.”

It's important to remember that utility companies are excited about the prospect of electric trucks and will usually be happy to work with fleets as they prepare to set up charging facilities and power grids to handle these vehicles.  
 -  Photo: NACFE

It's important to remember that utility companies are excited about the prospect of electric trucks and will usually be happy to work with fleets as they prepare to set up charging facilities and power grids to handle these vehicles. 

Photo: NACFE

Charging companies may offer very different maintenance packages, Roeth added. These may include services such as proactive monitoring and repair of equipment if needed. And Roeth stressed that fleets shouldn’t be shy about reaching out to local utility companies as they begin planning for electric truck deployments. “One thing to remember as you go through this process is that utilities want to see electric truck charging become a reality,” he said. “It may be because they have state or local environmental goals they need to meet. Or it might be a simple desire to increase the sale of electricity. So don’t be shy about reaching out to your local utility and telling them what you need and working with them to make those desires reality.”

Looking at the state of electric infrastructure today, Roeth said NACFE determined that initially, the power grid for charging electric trucks will be focused on private, “depot,” or “return-to-base” charging facilities and capabilities. Additionally, he said, fleets should consider the following factors as they prepare to deploy electric trucks in medium-duty applications:

  • Planning and permitting can be time-intensive and should begin immediately to get ahead of the curve in terms of vehicle deployment and charging requirements.
  • Fleets should work closely with local utilities, regulators, cities, neighbors, OEMs, and charging system providers.
  • Fleets must develop a fairly sophisticated understanding of their existing electric infrastructure and demand, their electricity rates, and the types, number, duty cycles, and time available for charging of their vehicles.
  • Planning should be done on a site-by-site basis.
  • Programs to mitigate costs will speed the electrification process.
  • Fleets should consider investing in smart networked charging software and services.
  • Fleets should demand improvements from technology providers and utilities.
  • Fleets should not draw rash conclusions in the first year of operation.

Lund also noted that Fleets, as well as utilities, regulators, and technology providers, are constantly learning and developing in this rapidly evolving space. Additionally, innovative utility programs and rate structures are allowing commercial battery electric vehicles to charge successfully and economically in growing areas of the country. However, to scale electric vehicle adoption across the nation, much broader and faster design and approval of these sorts of programs by utilities and regulators is needed.

Although NACFE found that the charging infrastructure in North America is clearly not sufficient today to handle the large-scale deployment of electric cars and trucks, Roeth said that establishing a capable electric grid for these vehicles is not an insurmountable problem. “The lag between product introduction and infrastructure investment has been repeated many times,” he noted. “And there’s no reason to think it won’t be repeated for commercial battery electric vehicle charging infrastructure as well.”

Originally posted on Trucking Info

About the author
Jack Roberts

Jack Roberts

Executive Editor

Jack Roberts is known for reporting on advanced technology, such as intelligent drivetrains and autonomous vehicles. A commercial driver’s license holder, he also does test drives of new equipment and covers topics such as maintenance, fuel economy, vocational and medium-duty trucks and tires.

View Bio
0 Comments